Arena Entertainment
Project Details
New commercial site development and building of a warehouse and underground parking facilities. Building to facilitate indoor entertainment services which included a giant inflatable indoor playground, basketball courts, bowling alley, arcade area and on-site café.
NCL provided both civil and structural design calculations, drawings and certification (PS1) & (PS4), in accordance with client’s design brief, architect’s drawings, and the Construction Industry Council (CIC) guidelines.
Civil Scope of works included:
- Bulk Earthworks Design and Volumes
- Silt Control and Site Management Plan
- Site Cross Sections, long sections, Retaining Wall heights
- Stormwater Detention Design
- Civil Design of Carparking, Drainage and construction details.
Structural Scope of works included:
Concept and Preliminary Design Phase
- High level design strategy meetings on the structural engineering elements of foundation system, gravity system, bracing system, façade construction strategy, BIM strategy, building maintenance strategy, and construction methodology including health and safety aspects.
- Concept engineering sketches for the gravity supporting elements.
- Concept engineering sketches for the lateral (seismic and wind) bracing elements.
- Initial value engineering exercise.
Development Design Phase
- Engineering design and detailing using Revit draughting.
- Coordination meetings for architectural items.
- Value engineering exercise.
Detailed Design Phase
- Engineering design and detailing for Building Consent documentation submission.
- Coordination meetings with design team.
Construction Monitoring & PS4
- Liaising with contractors and the client.
- Site visits at every appropriate stage of construction.
- Updating documentation and issuing inspection reports.
- Compiling PS4 (Producer Statement Construction Review) documentation.